Load Bank Testing

Your Generator and UPS System must be tested and commissioned with comprehensive procedures.  Your maintenance vendor should also provide regular checkup of your system. But can you say that the systems must go well under power outage and disruption.

 

You can only say after you take the load bank testing.

 

Fully loading the power support system stresses all components. It is clearly preferable to identify potential weaknesses under controlled conditions rather than to wait until the system is supporting a critical load.

 

Load bank testing is the connection of an electrical load to the Generator or UPS, in order to simulate the client’s load and prove the integrity of the overall system. Load bank testing ascertains the performance of the system, and of the entire electrical supply infrastructure including cabling, switchgear, generator and fuses. A load bank can also be used to discharge batteries as an effective, accurately and relatively low cost method of determining battery autonomy.

 

Email Subscription

Please select items you are interested

Design & Build Service
Product Information
Maintenace Service
Promotion Information
Others